ADVASC is the two units in the bottom left half of the EXPRESS Rack (they look the whitest). Here it is awaiting the first crew activity where cables will be connected between the two ADVASC units and between ADVASC and the rack. These cables will supply ADVASC with power, enable ADVASC to communicate with the ground, and provide the water needed to keep the hardware cool.